
Kesin Kabul ve Teslim Aşamaları
Knowledge and experience in all engineering stages of the processes from design to production, from production to delivery for fully automatic stainless machines in wastewater and drinking water treatment plants designed for tender works of public and private institutions , in detail; cost calculations , project reading, material supply, technical drawing and production , control panel project design, cable installation projects if any, preparation of automation software (PLC-HMI-SCADA-APP), integration of machines with different platforms, quality control and assembly works in tender preparation processes of public and private institutions.
Monitoring the processes after the delivery of machinery and equipment, checking compliance with national and international norms , quality control and maintenance stages. Industrial design and project reading in turnkey projects, stainless machinery and equipment production, field piping, steel, polyethylene and channel assembly and welding work control, roof and steel construction production and assembly, knowledge and experience in facility pre-delivery test stages.